How the checker decides
It applies the state rules summarised in our rules by state: the size limit, the minimum lot size for the fast approval route where there is one, and the kinds of land excluded from it. It then flags anything that usually means a full application to council, such as a heritage listing, high bushfire risk, flood control land, no town sewer or a strata lot.
The fast routes, state by state
| State | Size limit | Approval | Rent to anyone? |
|---|---|---|---|
| New South Wales | 60 m² (some councils allow more) | CDC on lots of 450 m² or more, otherwise DA | Yes, to anyone |
| Victoria | 80 m² (60 m² before 15 October 2026) | No planning permit on lots of 300 m² or more; building permit always | Yes, to anyone |
| Queensland | Set by council (Brisbane: 80 m²) | Council rules; often no planning approval, building approval always | Yes, to anyone (since September 2022) |
| Western Australia | 70 m² internal floor area | No planning approval if R-Codes compliant; building permit always | Yes, to anyone |
| South Australia | 70 m² | Development approval always | Yes, to anyone (since 2023) |
| Tasmania | 60 m² (90 m² proposed) | Planning permit in most cases; 90 m² change under assessment | Yes, to anyone |
| Australian Capital Territory | 90 m² (40 m² minimum) | Development application | Yes, to anyone |
Reading your result
- Green: your block looks eligible for the fast route in your state (complying development in NSW, no planning permit in Victoria, exemption in WA, accepted development in many Queensland councils). Building approval is still needed.
- Amber: a granny flat is usually possible, but through a development application or a permit, which takes longer and costs more.
- Red: something you entered is outside the rules, such as a size above the state limit or a strata lot. Change the design or ask a town planner.
Before you rely on it
Local plans add their own controls: setbacks, site cover, private open space, parking, easements, and sewer mains under the yard. Get a planning certificate or property report for your lot (a section 10.7 certificate in NSW, a planning property report in Victoria) and show it to your builder or certifier.